The highest standard of AV

Industry
Location
London, United Kingdom

The challenge

Kinly was entrusted to deliver this prestigious project for Bloomberg’s new European headquarters. Located in the heart of the City of London, in between the Bank of England and St Paul’s Cathedral, the eight-storey building stretches across a three-acre site and has over 450,000 square feet of office space to house its 4,500 employees and modern media services.

The solution

Following a lengthy and highly competitive tender process, Bloomberg entrusted Kinly to deliver a major audio-visual installation for the media giant’s special areas project. This covered a network operations centre (NOC), VIP dining room and 15 training rooms. In this project, Kinly worked closely with the building contractor, Sir Robert McAlpine, and commissioning consultant, PTS Consulting.

The NOC includes three Planar video walls and an interactive 98-inch LCD display which are installed to bespoke, floor-mounted stands to complement the aesthetics of the metal fins on the outside of the building.

The VIP dining room will be used by Michael Bloomberg when entertaining dignitaries and clients. This room features discreet but cutting-edge AV technology. This includes a Meyer Constellation voice lift system which has seven microphones built into the lighting pendants above the table and 60 active speakers in the ceiling and floor heating to allow incredibly natural and discreet voice lift so that anyone on the table can speak and be heard by anyone else.

In addition, we delivered 15 training and flex rooms which are state-of-the-art training spaces complete with dual or triple 84- and 98-inch displays. They employ a Q-Sys voice lift system with Shure beam forming ceiling microphones so that all delegates in the room can be clearly heard during training sessions. These spaces are a mixture of divisible and fixed rooms that are specifically designed to train Bloomberg terminal users. Intelligibility of the visual information and the trainers’ audio are paramount to Bloomberg’s operations which drove the significant investment in these spaces.

The result

Now complete, the colossal Bloomberg Place is one of the most impressive spaces in London's business district. Kinly’s implementation formed part of an unprecedented building project, estimated to have cost in excess of £1.2bn.

Why Kinly?

We bring people and technology together for better productivity, wherever the work is happening.

Experienced

Dedicated expertise in designing, integrating, and supporting collaboration systems and managed services.

Proven

Globally recognized businesses depend on us to deliver high-performance, secure, and flexible workplace collaboration services.

Independent

We partner with the world’s top vendors to deliver the best choice of solutions for public and private sector businesses.

Scale

With a global presence, we are an end-to-end provider of internationally scalable workspace transformation solutions.

40+

Years Experience

2500+

Customers

900+

Accredited Specialists

480 M

Annual Turnover

1400+

Employees Worldwide

94%

Customer Retention

24x7

Global Support

25

Offices in 12 Countries

Back to top